Skip to content
Glossary

Standard cost

Definition

A standard cost is a predetermined cost per unit of product, built from expected quantities and prices of materials, labour and overhead. Inventory and production move through the books at standard, and the differences from actual costs are recorded separately as variances, which show managers exactly where spending departed from plan.

How it works

Setting a standard means answering two questions for each input: how much should one unit use (quantity standard) and what should that cost (price standard). A chair might need 4 kg of wood at 5 per kg and 1.5 labour hours at 20 per hour.

Variances split the total difference into causes. A material price variance is the effect of paying more or less than standard for what was bought; a usage variance is the effect of using more or less than the standard quantity for the actual output. Labour and overhead have matching rate, efficiency and spending variances.

IAS 2 allows standard costs as a measurement technique if the results approximate actual cost, so standards must be reviewed regularly. In Ledgeriano a bill of materials rolls up to a standard cost, production orders close with their variances, and the job cost sheet shows material usage and price, labour rate and efficiency, and overhead variances.

Formula

Material price variance = (Actual price - Standard price) × Actual quantity

Material usage variance = (Actual quantity - Standard quantity for actual output) × Standard price

Example: material variances for 1,000 units

The standard is 2 kg per unit at 5 per kg, so 10 per unit. To make 1,000 units the factory used 2,100 kg bought at 5.20.

Example: material variances for 1,000 units
CalculationVariance
Price variance(5.20 - 5.00) × 2,100420 adverse
Usage variance(2,100 - 2,000) × 5.00500 adverse
Total material variance10,920 actual - 10,000 standard920 adverse
FAQ

Questions about Standard cost

Is a favourable variance always good?

Not necessarily. A favourable price variance from buying cheaper, lower-quality material can cause an adverse usage variance in production. Look at related variances together.

How often should standards be updated?

At least once a year, and whenever prices, recipes or processes change significantly. Outdated standards produce large variances that hide real problems.

Put the terms to work

Post a balanced entry, run a trial balance and close a year in a real ledger. New accounts get free credits to get started.